Tuesday, November 28, 2006

Post-Thanksgiving

I knit very little over Thanksgiving. A few rows on the actual day, I think.

But did a lot of talking about knitting and knitting-related things.

Dave's mom offered to knit us another afghan. Cool! She said that she does them now on US 17 and needs 10 balls of Lion Brand.
So yesterday I inspected some colors in person, and finally seleted Barley.








Yesterday JoAnn had free shipping, so I had all the yarn shipped directly to her! Thanks JoAnn!
This picture doesn't show it off well. It matches our furniture and leans more in a direction that I'd like to go colorwise (instead of the always orange direction).

Then my father visited and I told him I knitted the sweater I was wearing (baby alpaca, drops design). He did not reply. I said, "Did you hear me?" He said, "Something about your sweater." I said, "Yes, I knit it." He just sort of nodded, like, uh huh.

So the next day, I asked him if he could create sweater closures out of leftover wood (he's a woodcarver). So I brought down a bunch of sweaters that I had made to illustrate my point. I said, I MADE these. He says, "Yes, I can tell."

And people wonder why one day was all I could stand with the man.

Then he asked me to knit him a scarf. Trying to help him pick a color other than beige or brown to go with his beige coat was quite a struggle. We finally settled on these two colors:











The scarf will be knitted horizontally (CO a gazillion stitches) in stripes. Luckily he doesn't want it to be too long. So I purchased some Knitpicks Options Needles with a 47" cord. While I was shopping, I thought maybe Dave's mom would like some needles as well. So I called her to check. She told me that she's been knitting afghans on 29" circulars!!!!!!!!!!!! So I bought her some US 17 with a 40" cord.

Also, while perusing my favorite blogs, I came across the Urban Aran projects. Damn you knitting project pushers. I could not resist. So I purchased the pattern from JoAnn (free shipping yesterday, you know). Now I need to purchase the yarn. Although I have heard that the Elann Peruvian Highland Chunky is very sheddy, it really is an unbeatable price for this project.

While I was deciding on whether or not to buy this color:










I got an email from Elann that they were selling Boho:














A yarn needed for a pattern that I've had my eye on for a long time.

But really, it's getting a little out of control. And while the skirt would be fun to make, I question how much I would actually wear it. *sigh*

I am trying to save knitting (finishing) the chevron scarf for knitting at LPK. So I was working on my cashmere sock last night. I stop the pattern at 1.5" before the end. I'm almost there. This is sock #1.

Today I will return yarn to the stores I brought the Lion Brand colors home to show Dave and buy the elann yarn, that will probably arrive before the pattern does. Which while frustrating, will probably allow me to do a swatch, then again, maybe not. ;-)

Sunday, November 19, 2006

Excuse the dust

While I format my new blog and get all of the previous posts copied and pasted into blogger, because tripod lycos completely ruined my previous blog.

A lot of the old entries have sentences that run together - it's a formatting issue that I will fix. Just wanted to get all of the info in here first.

This will be the first entry that I will not have to change the date and time stamp! Yeah for me!

Saturday, November 18, 2006

UFO

This is an unfinished object that has not been touched for probably over a year.














It is the morning surf pattern in Knit Picks Shimmer Morning Mist
My husband said, "I haven't seen that in a while." I said, "It's been sitting in the same place for about a year." He said, "I mean, I haven't seen you work on it in about a year."
Well, yes, that would be accurate.
And as soon as I picked it up, I remembered why.
Not because it is worked on a size US2.











But because before I could even start knitting, I had to rip out two rows.
It may not be obvious, but there's a right and wrong side to this piece. I managed to knit another 8-10 inches on this yesterday. I would like to finish it - just to see what it looks like once blocked properly.
And the chevron scarf, I'm happy to report, is three and a half feet long!

Saturday, November 11, 2006

need a photo shoot

for all the pieces that I've completed!
yesterday while babysitting movers for my friend who moved to France, I made major progress on the sleeves to the mohair Japanese cardigan pattern. it's now finished and I'm wearing as I type!
here's what I'm working on now:










you may remember this needle from the high anxiety, cheap, cute needles that were on sale at Tuesday morning
they are perfect for this pattern, as they are SUPER pointy and make the kf&b x 8 (two times) a piece of cake!
I'm using koigu and nature's palette yarns mixed together
Joyce and I went to Purl Soho in Costa Mesa on Wednesday - which is basically a small warehouse. I looked for another koigu to mix for the pattern, because the nature's palette is a bit bigger in diameter. I bought some koigu that I thought might match, but it didn't - it was too silvery blue. the nature's palette color is much more brown and works bettter color wise.

Saturday, November 04, 2006

between

petting giraffes and worrying about work, I finished the vest cape, but am not super pleased with it.
it's very tight and I feel like it's too short
I also finished this pattern













in a very soft pewter grey wool boucle and it turned out very nice!
I'm now working on another Japanese pattern in an acrylic mohair, lace chevron fronts and sleeve bottoms.
and I'll also be starting the Last Minute Knitted Gifts chevron scarf with these yarns:










I've been reading that it's fast and easy.
And my friend who just got back from Paris, said all the women looked like me and wore scarves, so maybe this will wind up being my travel scarf?

Tuesday, October 17, 2006

Finally! A wool I Like

I started my first Jpanese pattern: Vest Cape.
It's very hard to find a substitute yarn for a pattern, let alone a pattern which lists the yarn in Japanese. All I had was the gauge to go on.
And with my mathematical challenges, that was not easy either.
I ripped two times before I got the gauge for the combined yarn beginning:
I used the Patons Soy Wool Stripes in Natural Navy and Noro Cashiroha in Natural.
The rest of the piece is ribbed. It's knit all in one piece. The yarns are so soft, I can't stop knitting once I start.

Sunday, October 15, 2006

Friday, October 13, 2006

Yes! He tried it on.

the past two times I went to knit at LPK I worked on Dave's sock.
the question I got each time, "Did he try it on yet?"
I think they were concerned that it might not fit.
But I happy to put all of the concerns to rest.








In fact, I knit too far, I need to rip out a few rows to complete the toe decrease!

Sunday, October 08, 2006

you'd never know

that I hadn't worked since Sep 15
I have been knitting - and networking!
the alpaca sweater is finished and looks DAMN good. I've worn it twice and no one asked me, "Did you make that sweater?"
it's all about sox now and the mystery project. I am holding my breath that: 1) I have enough yarn and 2) it turns out somewhat as I have envisioned
sock 1 (for Dave, Sheree helped me figure out where I had stopped and what I needed to do next today)



















and sock 1 (for me, Knitty.com Hedera, leftover cashmere. I've tried it on several times and it's starting to take the shape of my calf).



















mystery project was supposed to be this:
















but I gave up on it last winter when it wasn't turning out anything like the picture. I ripped the back out - 2.5 skeins - the other day.
now the mystery project back is complete and I'm working the two front sides of the mystery piece at the same time.
I really don't like this yarn. it feels like plastic. the give of the elastic makes a gauge swatch useless.
if the mystery project works, it will be a miracle of G-d.

Wednesday, September 20, 2006

Happy Birthday to me!

or what my second birthday present was, because the camera that I got, that took this picture, was actually more for my husband.
my first blocking project on my blocking board!















the front left was almost done, and then I saw stockinette inside the garter, so I ripped to about four inches from the bottom
then I noticed stockinette inside the garter about an inch from the bottom, so I ripped even further
I got the garter right the rest of the way up, but ran into trouble on the decreases for the neck
I didn't like the SSK that I tried, so I ripped it out and tried SKP
I'm not thrilled with this either, but was too lazy to look up something better
I've been so unfocused since I've stopped working
I got lost in the pattern instructions and when I got about 4 inches from binding off, I thought that I had decreased too much, so I ripped it back to 22 sts left on the needle.
re-read the instructions - it was supposed to stop decreasing at 29 sts
so now two pieces blocking, three more to go!

this week's jonesing




I decided this weekend that I must knit more socks - that this would be an excellent way to reduce my leftover stash of yarn
so I researched on Knitter's Review Forum, Book Recommendations and have always seen knit and tonic's can't live without.
So I bought:















and
















my order hasn't been shipped yet, but I am already crazy for two new circulars, so that I can use up the leftover cashmere yarn
that would be 16" US 1s
I found this interesting needle comparison, while I was trying to decide if I should by Knit Picks circulars or Inox circulars:
http://www.grumperina.com/knitblog/archives/2006/07/weighing_in.htm
tonight is knit night at LPK, I will see if they have the Addis, if not, I'll place an online order for the Knit Picks needles

Thursday, August 31, 2006

my friend, close to tuesday morning

when I wrote her about how crazed I was that sheree had found knitting needles at tuesday morning and that my closest store didn't have them,
she became my
S U P E R H E R O
and picked herself off her couch on a hot sunday afternoon and went to her closest store to look for me!













this was my sneak peek, as neither of us made to LPK last night

Sunday, August 27, 2006

school sweater

the yarn from the previous post was gobbled up into a scarf in six days
when I started the project, I decided that if it turned out well, that I would submit it to knitty.com
I showed it to my friends and they loved it and one wanted the pattern. I wrote the pattern in 10 minutes
then, I deliberated over the submission of the pattern to knitty.com for 12 days
in the meantime, school has started, and I told all of my knitting friends that I would not start a new project because it would be too tempting to knit and not do school stuff
then I proceeded to start this sweater in knit picks alpaca silk:

done in this color from the bequeathed collection.

I've got black, white, and cinnamon of the the same yarn to figure out what to do with as well
I think part of the reason I started a new project is because I intuitively knew that my contract wasn't going to be extended and that I would soon have more time to knit.
and sure enough the contract was not extended. my last day is the 15th of September.
I have been eyeballing this pattern for awhile:

using this knit picks alpaca.

so dave said that I should buy more yarn while I was still working. so on Thursday I did. It was shipped on Friday.
Along with that purchase I bought a skein of yarn to add to the socks I'm going to make for Dave. The yarn that his sister bought for me for by birthday - wasn't enough for my sox:














and it definitely won't be enough for his.
when I asked him which he would like first - his sox or the golfclub cover for his new driver, I'm sure no surprise to you, he said golfclub cover.

Tuesday, August 01, 2006

yarn arrived yesterday

and I went at it with much enthusiasm
I wound a bunch up and have joined two skein for a nice-looking fabric
dave helped me with the math, so I've got the pattern
but now I'm nervous that I won't have enough yarn.

Saturday, July 29, 2006

time and changes

Although I haven't blogged, I have been knitting.And I also gave away a bunch of projects that looked like crap because I failed to knit a gauge swatch.
Since I've last blogged, I've made a commitment to knit more perfectly. This often involved lots of ripping.
And my most recent foray into knitting without a gauge swatch involved a waste of yarn - cabled mohair that will never be able to be undone.
But here is a picture of finished cashmere items for Dave:















And here is the Interweave Spring 2006 Picot Camisole in Frog Tree Pima Silk:



















And here is the cashmere I'm waiting for - for a special gift for someone (and then lots left over for the Greetings from the Knit Cafe Slouchy Cardigan:



















Hopefully more soon.

Saturday, December 03, 2005

pathetic

-my blogging commitment-the sweater that I re-did for dave-my ability to complete projects that I start-the amount of time I have to knit-going to the yarnlady bag sale when I have more yarn than I'll ever be able to knit up in this lifetime if I continue working full time and consider going back to school at the beginning of the year

Saturday, November 05, 2005

should be called knitting for dave blog

I finished his scarf and even blocked ithe said, I must be a very special person, you never block anythingand then said, so now you'll start on the fingerless gloves?...so making good progress with the cotton angora side to sidewhen he pulls THE sweater out of the closetthis sweater is practically exactly one year oldand it's been sitting in the closet patientlyafter the "finisher" had her way with itI couldn't stand it any longerthe beautiful pathetic sweater that was not being wornat 10:30m am I began ripping it apartat 1:30 I was almost finishedwhen I say ripping, I mean, just to the armholesthis sweater was seamed before I knew what I was doingand that's why it went to the "finisher"dave helped rip apart a sleeve todayand I'm almost done with re-working the frontit will be like a weight off my shouldersand then I will finally delete the message from the "finisher" from my answering machine - saving her phone number all this time - thinking I might actually call her up one day and tell her what a horrible job she did and the sweater doesn't fit

Sunday, October 09, 2005

slowly but better

I have had no time to knit
the only drawback about working againI am making huge strides on the front of the swooped eyelet pulloverbecause I'm not having to rip out every two rows that I knitthis makes me happydave's cashmere scarf is a slow work in progress as wellherringbone pattern, size 2 needlesI believe that I failed to mention that I bought the cotton angora in the color forest.I'm going to make this sweater from the DB CA book















and instead of working on my paper or knitting yesterday, I found this sweater that I really want to do

Friday, October 07, 2005

doesn't he listen

I told my husband not to let me buy anymore yarnbut there he sat complacentlyas I punched in my credit card number at herschnerr's faster than he could say cotton angora













speaking of angorafluffer just ploppedwhen he eats so much that it's nap timehe plops on his sideit's very cuteso back to the yarnit was $3.47/skeinit's flying off the H shelves

Saturday, October 01, 2005

ripped a skirt

I tried to knit a skirtand then found out how unflattering it is on me
so I ripped it outI've spent the last few hours (not working on school work like I was supposed to) researching patterns and installing my knitware software on my laptop to design something new







it will be like this sweater but a cardigan, not a pullover{crossing my fingers that I have enough yarn}I also ordered the software updateit's supposed to have yarn estimation improvementsthat would be niceok I'm really going to work on my midterm reflection paper now