by working two days a week
but I finished the urban aran, sans zipper, which is on its way from the zipper stop
knitting was completed in 11 days
the hardest part, besides following three patterns at one time, was the collar
the length is a lot longer than prescribed and the arms are a little longer as well, but it is very comfy and I can't wait for the weather to get cold enough so that I can wear it without sweating
Thursday, December 28, 2006
Subscribe to:
Post Comments (Atom)
1 comment:
it turned out gorgeous!!!!! Love it!
Post a Comment